Materials Available for Review:
1.
Lot line GPS coordinates and elevations 1/07
2.
Interior road GPS Coord and Elev 1/07
3.
GPS Coord and Elev of Utilities and Public Rd.
4.
Division Engineering Study 1/07 Prelim.
5.
Electrical Engineer Study (Video) 1/07 Prelim.
6.
Water Studies, maps, video 1/07 Prelim.
7.
Access Road Plan 3/07 Prelim.
8.
Re-Construction/Forestation Plan 3/07 Prelim.
9.
Lot Area Calcs based on Eng. Rec. Prelim.
   
   
   
   
   
   
Lot Area Calcualtions